Sharpened Impact — Internal Planning Tool

Command Infrastructure Sizing Calculator

Estimates Supervisor and Lead headcount, CCI attendance, and CLP cohort requirements for a given plant size, built on manufacturing span-of-control benchmarks.

SID · CCI · CAS · CLP
Frontline Command Methodology™

Plant Configuration

Span Assumptions

Supervisor span (workers per Supervisor)

Manufacturing frontline benchmark range, midpoint ~20.

Lead span (workers per Lead)

Team-leader model — small teams, direct daily contact.

CCI Attendance Add-On

Additional leadership attendees per plant

Operations Manager + QA Coordinator(s) + Safety Coordinator(s). They complete CCI alongside Supervisors so leadership and the frontline speak the same Command language. Leads do not attend CCI — they attend CLP only.

Scenarios

Saved scenarios stay on this device. Nothing is uploaded, so they survive with no network.

Per-Plant Readout

Supervisors
5people
range 47
Leads
15people
range 1320
CCI Attendance — per plant

Supervisors + Ops Manager / QA / Safety Coordinators (Leads attend CLP only, not CCI)

11 attendees
CCI Cohorts Needed — this plant

Up to 15 attendees per CCI cohort, deliverable as 3 × 2-hour virtual sessions/week across shifts

1 cohorts
5 Supervisors (CCI)6 Ops/QA/Safety (CCI, range 57)15 Leads (CLP only, not CCI)

Single-Site Totals

Total Supervisors
5people
range 47
Total Leads
15people
range 1320
CCI Attendance

This plant only.

11 attendees
CLP Cohorts Needed

This plant only. 25 Leads per cohort cap. Leads only.

1 cohorts
CCI Cohorts Needed

This plant only. 15 attendees per cohort cap.

1 cohorts

Single plant · 100 total frontline workers.